There will be slowdowns again at the Tusket overpass.
Repair work for the bridge will continue after a break over the holidays.
During the jacking of the structure, there will be shutdowns in 15 minute intervals on Highway 308.
The remaining work includes concrete and curb, beam and post installation.
The work is expected to be done by mid-February.